Controls
Each control's status is one of implemented, partial or planned, with the date it was last verified. Framework references are to the SOC 2 Trust Services Criteria and the HIPAA Security Rule. Sign in or request access to see the evidence behind each control.
9 controls are not listed here. They are the ones still partial or planned. The full breakdown is published on the overview — we are not hiding how many — but naming them publicly would hand an attacker a list of what we have not finished. Request access or sign in to see every one, with its evidence.
Availability & continuity3
The production database can be restored to any point in the last 6 hours.
All services deploy from the main branch with no manual configuration on the host; a lost service is redeployed, not rebuilt by hand.
An automated probe checks every public surface and each reachable integration on a fixed schedule, records the result, and raises a staff alert on a confirmed failure. Current state, 30- and 90-day uptime and incident history are published on the Trust Center.